TABLE 7 Cost per Structure Prepared for the Pilot Indoor Residual Spraying Campaign, Koulikoro District, Mali, May–September 2014
VillageNo. of Structures TargetedMobilization Costs (USD)No. of Structures Prepared% Structures PreparedCost per Structure Prepared (USD)
Door-to-Door Mobilization Villages
Fassa255201.4519978.04%1.01
Wolongotoba Socoro372293.8823061.83%1.28
Wolongotoba Socoura250197.5023292.80%0.85
Mobile-Messaging Mobilization Villages
Fougadougou163771.006640.49%11.68
Tienfala Gare2621,239.2614454.96%8.61
Tienfala Village (text only)151258.217147.02%3.64